I have privately complained regarding this via ticket and DMs with no progress, so I’m having to resort to forums.
My first ticket was responded unsatisfactorily and told after a year that the highway would be completed soon in 2023.
A year later it has still not been completed and after complaining again to staff, my complaint was not passed on by nightemperor. After chasing this up I was given permission to lower my section of the highway, i.e. the region I had co-ownership of. It was already agreed that the whole highway would eventually be lowered even though no action in 2 years taken.
Since then, staff decided to unfairly ban me for making the change agreed (lowering the level). I feel I have been duped as I had to demolish a bridge, which I wasn’t aware was made recently until after a complaint was raised. I was banned despite being the only person to make any effort to lower the highway in 2 years.
The SUD team that created it, Beak, Fel, Somfic, Cakey all did not complete the request from staff to fix the issue last year.
I raised a ticket prior to the complaint from Fel and staff mysteriously deleted the channel with the tickets and my ticket along with it.
I raised another ticket and this was ignored and I felt I wasn’t going to get anywhere.
There had been no consultation prior to the highway being built between SUD and any owners/managers of 2 nearby cities and one owner duped. I don’t believe permission was sought properly from Dove Valley either.
In 2023 screenshots were raised and Luc said if there if progress stalls “we can re-evaluate an eyesore”
At the end of my ban Luc appeared to give them more time despite my tickets being raised and deleted.
I would like to report that no progress has been made and would like the region removed and the highway eyesored and demolished/cleared out.
This highway is hindering the progress to my city and I’ve not being able to make a connection properly to the highway without knowing what SUD is going to do with it.
The highway and skyrail is stupidly high, possibly on purpose to troll us and is unacceptable.
We previously had a conversation with Cakey on the 31st Aug 2023 with promises to complete lowering it but no concrete proposals outside of that.
I would therefore like to request that action taken immediately and affected highways removed within rendering distance of Dove Valley and Ferobanke.
I will repost screenshots shortly.